Give the press area a clear reset

Clarify what ready looks like before the next press change.

Take the full example with youPhotos. People. A practical plan.

Project timeline, actions for every S and checks before completion.

Open sample PDF Free to read. No sign-in needed.
Generated illustration: Give the press area a clear reset, starting condition
Generated concept: a possible improved arrangement for Give the press area a clear reset
Starting pointProposed concept
Generated illustrations. The concept shows a possibility, not a completed improvement or verified safety result.

A-grade is the proposed target. A begins at 90% in the existing OPEX rubric. This target uses the same observed criteria and coverage as the sample baseline. It is proposed, not earned from the generated concept; Sustain and other unknowns remain unscored.

Learn it, then try it

Understand the method
behind this example.

Two illustrated lessons with practical steps, a question to try and feedback. Read online or follow the teaching pages in the full report.

A clear starting point

Make the problem
small enough to work on.

Oily access areas, mixed die-change equipment and poorly separated offcuts obscure the press area’s ready condition. Focus the first trial on the staging and access zone.

Visible press surroundings, die-change staging and storage boundaries. The press operating envelope, temperature, hydraulic systems and lifting methods stay under existing competent controls.

Sample baseline31.6%Sample condition score
Proposed goal90.8%A-grade target

Illustrative starting figures. The goal has not been achieved.

Manufacturing / 6SOPEX field notes

Give the press area a clear reset

Clarify what ready looks like before the next press change.

Sample starting point31.6%Sample condition score
Goal to work towards90.8%A-grade target
01

See the starting point

02

Picture a better arrangement

03

Test one area

04

Check and repeat

See the starting pointPicture a better arrangementTest one areaCheck and repeat

A worked example to learn from. Sample figures and people; targets are not achieved results.

People, timing and a clear finish

A plan the team can follow.

Read the full report ↗

Project completion timeline

Planned finish · Day 30
  1. Define the ready areaRosa · Press lead

    Day 1–7 · Agree the service boundary, die states and authorized work conditions.

  2. Restore staging spaceNoah · Maintenance lead

    Day 8–14 · Noah records the residue-source investigation, authorized correction and real recurrence check; verify the storage arrangement too.

  3. Practice the resetLeila · Shift trainer

    Day 15–21 · Both shifts demonstrate the ready-state check and missing-item response.

  4. Check the next changesArun · Quality lead

    Day 22–30 · Repeat ten comparable preparation observations without weakening press controls.

Proposed timing and fictional owners. Close each action after its check is met; a date alone does not prove completion.

Actions for each S

Planned finish · Day 30
  1. SortSeparate usable stockRosa · Press lead

    Identify usable billets, profile stock and offcuts with the press lead; route uncertain material through the existing disposition process.

    Day 1–7 · Every retained bundle has a known identity and use; rejected material cannot return to the press feed.

  2. Set in orderClarify staging positionsNoah · Maintenance lead

    Trial supported billet and profile positions outside the original press, guard and runout operating envelope.

    Day 8–10 · The next changeover finds the required stock while existing equipment access remains clear.

  3. ShineInvestigate press-area residueNoah · Maintenance lead

    Maintenance investigates hydraulic oil and grease recurrence, performs approved correction and records follow-up checks.

    Day 8–14 · The cause and correction are recorded with a recurrence check during comparable operation.

  4. StandardizeAgree the press-area resetLeila · Shift trainer

    Document the accepted staging, replenishment and handover checks with the press and shift leads.

    Day 15–17 · A second shift demonstrates the same reset and knows how to report an abnormal condition.

  5. SustainReview consecutive changesArun · Quality lead

    Track material readiness, missed resets and recurring residue across the proposed month.

    Day 18–30 · The day 30 review uses comparable changes and open-action evidence before retaining the arrangement.

  6. SafetyReview heat and equipment accessRosa · Press lead

    The competent press lead reviews approved guards, hot-material handling, stock support and access before any change.

    Day 1–30 · No staged material or new marking compromises the established operating controls.

Proposed timing and fictional owners. Close each action after its check is met; a date alone does not prove completion.

Bring the idea back to your work